Horizontal directional drilling can install conduit, pipe, and cable with less open trenching, but the bore still has to pass existing utilities safely. Your Local Pro Hydrovac provides hydrovac support for directional drilling, including crossing verification, potholing and daylighting, and excavation at selected bore or access locations.
The goal is to give the drilling crew reliable field information and enough working space for the planned operation. Hydrovac may be used before the bore begins, at utility crossings along the path, at entry or exit areas, or when an existing line must be exposed during the project.
Before service, share the bore plan when available, locate marks, crossing points, requested pothole dimensions, estimated depths, truck access, hose distance, and the sequence of work. If the site has traffic control, restricted hours, disposal rules, or special safety procedures, include those details with the request.
For multi-crossing projects, the pothole sequence should follow the bore plan so the drill crew receives useful information before reaching each conflict. Field notes, depth measurements, and crossing IDs can also help the project manager keep the hydrovac results tied to the correct station or utility.
If the HDD crew changes alignment, new verification points may be needed before drilling continues. The hydrovac provider should work from the latest approved route rather than an outdated mark-up or earlier field plan.
Our Directional Drilling Hydrovac Process
A typical HDD support visit may include:
- Review the bore path, utility crossings, locate marks, and requested excavation points.
- Confirm safe truck position, hose routing, access, and spoil-handling requirements.
- Set up each approved pothole, daylighting point, or access excavation.
- Use water and vacuum excavation to expose utilities or create the requested working area.
- Allow the field contact to verify utility position, depth, and clearance information.
- Move to the next planned location or complete the excavation scope for the drilling crew.
Directional drilling support often involves multiple small excavations rather than one large dig. Good coordination between the locator, hydrovac operator, drilling crew, inspector, and project manager helps the work move in the correct order.
Need HDD Hydrovac Support? Call 888-907-6390
- Chris Wentworth
Glad i went with them. I was on the fence about trying a new company, but they made the whole process super simple. If you need service give them a try.
- Laura
They don’t make companies like this anymore. Honest, hard-working, and didn’t try to nickel and dime me. I’ll definitely be givin them a call again.
Hydrovac Work That Supports the Bore
The exact scope depends on the utility corridor and drilling plan. The local provider can review whether the requested work fits the truck, hose reach, water supply, debris capacity, and site conditions.
- Crossing Verification: Expose selected utilities along the bore path so their field position can be confirmed.
- Potholes & Daylighting: Create targeted test holes before drilling or excavation proceeds through a marked utility area.
- Bore Access: Prepare compatible entry, exit, or intermediate excavation areas when hydrovac is appropriate for the required dimensions.
- Project Coordination: Sequence excavation points around drilling, inspection, traffic-control, and utility-owner requirements.
Schedule Directional Drilling Support
For fiber, electrical, gas, water, communications, or other HDD work, Your Local Pro Hydrovac can provide hydrovac support where controlled excavation is needed. Send the bore information and crossing list so the local provider can review the work before dispatch.
